Personalized  

Flower Oval Ring

$20.30   $29
ENGRAVING OPTIONS:
Flower:

Enter your personalization:

Ships in 6 - 9 business days

OR

Description

Most of us know our birthstone, but did you know we also have a flower linked to the month we’re born? Similar to you, each flower design on the Flower Oval Ring is unique and one of a kind. Represent your flower in a subtle way, making for a great conversation piece. Or give it as a gift to a loved one for a sentimental gesture.

  • Material: High Quality Solid 925 Sterling Silver
  • Dimensions: 0.4 inch Oval Charm
  • Finish: Sterling Silver ∙ 18K Gold ∙ Rose Gold

SKU: MM-RM52a

Rings are created true to standard US sizing. For the best fit we suggest having your finger(s) sized. We offer a physical ring sizer as well! Alternatively, you may follow the steps below to find your best fit:

  1. Wrap a string around your finger where you'd like your ring to be or place the string across the inner diameter of a ring that fits you from end to end.
  2. Make sure that the string is pulled snug for the best accuracy
  3. Mark the spot where the string meets and measure with a ruler in millimeters (circumference) or measure the string's distance across the center of the ring (inner diameter)
  4. Use the circumference or inner diameter column in the chart below to find your size

  • Free Shipping on US Orders
  • 90-day Warranty
  • All our items are carefully crafted and made to last 
  • Ready to Ship: crafted ahead of time and ship out next day
  • Custom Made to Order: handcrafted and ships within 6 - 9 business days
  • Caitlyn Minimalist is a proud member of 1% For The Planet and Shopify Planet
All deliveries are carbon neutral
Powered by Shopify Planet
Make it your own
Enter your personalization
Select your font

Recommended For You
Editor II Huggies
Editor II Huggies
$16.45   $23.50
Best Seller
Editor Huggies
Editor Huggies
$14.35   $20.50
Best Seller
Paris Oval Hoops
Paris Oval Hoops
$18.20   $26
Best Seller
Toi et Moi Birthstone Ring
Toi et Moi Birthstone Ring
$23.10   $33
Selling Fast
Toi et Moi Birthstone Necklace
Toi et Moi Birthstone Necklace
$24.50   $35
Selling Fast
Duo Baguette Birthstone Ring
Duo Baguette Birthstone Ring
$22.05   $31.50
Selling Fast
Inside Out Diamond Huggies
Inside Out Diamond Huggies
$18.90   $27
Selling Fast
Diamond Drop Huggies
Diamond Drop Huggies
$23.10   $33
Best Seller